Scio Street and Alexander Street Project

2018 Preventive Maintenance Contract – Group 2


This is a federal aid project are being administered by the City of Rochester under agreement with the NYSDOT. The 2018 Preventive Maintenance Contract – Group 2 includes the following streets:

  • Alexander Street (Mt. Hope Ave to East Main Street); and
  • Scio Street (East Ave to Central Park).

The scope of the work consists of milling and resurfacing of the above streets, including repair of the existing pavement base where needed, adjustment of water valve and sewer castings, resetting or installing new granite curbs as needed, replacement of hazardous sidewalks, alteration or replacement of sidewalk handicap ramps to bring into ADA compliance where it is feasible to do within the existing Right of Way, installation of pavement markings and replacement of traffic loops.

Construction is scheduled to take place starting the spring of 2019.

Project Documents

 

Questions?

If you have questions or just need additional information, contact City project manager, Mr. Rich Koss, at (585) 428-6862 or email him.