2016 Preventive Maintenance Contract Group 3

About the Project

This federal and state multi-modal aided project is being administered by the City of Rochester under agreement with the NYSDOT, NYSDOT PIN 4760.50.  This project consists of street improvements to seven City streets.
 

  • North Goodman Street (Conrail – Garson Avenue)
  • East Main Street (North Clinton Avenue – North Goodman Street)
  • University Ave. (East Main St. – N. Union Street)
  • Allen Street (Brown Street – Morrie Silver Way)
  • Brown Street (West Main Street – State Street)
  • Morrie Silver Way (Oak Street – State Street)
  • Wilder Street (Grape Street – Brown Street)

The scope of the work consists of milling and resurfacing city streets, including repair of the existing pavement base, resetting or installing new granite curbs as needed, sidewalk repair inclusive of installation of handicap ramps as well as equipping existing ramps with truncated domes, adjustment of sewer and water castings along with repairing receiving basins, and replacement of traffic loops, regulatory traffic signage and pavement markings.

Schedule

Preliminary Design     Spring 2015 
Final Design          Summer 2015 
Bid           Fall/Winter 2015 
Construction Spring/Summer 2017 

  

Project Team

  • Project Management: City of Rochester Dept of Environmental Services  
  • Project Design: Erdman Anthony 
  • This project is partially funded by federal Transportation Improvement Program funds distributed through the regional transportation improvement program and administered by New York State Department of Transportation.
  •  

    Project Documents

    Draft Agreement, General Policies & Design Standards (applies to all)

    Questions?

    If you have questions or just need additional information, contact Tim Hubbard at (585) 428-7154 or email him.