Kilmar St Group Project

The Kilmar St. Group – Reconstruction/Rehabilitation/ Curb Replacement Project

About the Project

The City of Rochester will be making improvements to Kilmar St, Shady Ln, Rexford St, La Frois St, and Milan St

On Kilmar Street the project includes; removing existing gutters and installing new granite curbs, new under drain, catch basin replacement or adjustment, milling and resurfacing the pavement, replacing concrete sidewalks where required, driveway aprons and placing topsoil and hydro-seed to restore areas disturbed by construction activities.

On Shady Lane, Rexford Street and Le Frois Street the project includes; removing existing gutters and installing new granite curbs, new under drain, catch basin replacement or adjustment, pavement reconstruction, replacing concrete sidewalks where required, driveway aprons and placing topsoil and hydro-seed to restore areas disturbed by construction activities. Shady Lane will also have a new water system installed, including; watermain, water services, valves and hydrants.

On Milan Street the project includes; removing existing gutters and installing new granite curbs, new under drain, catch basin replacement or adjustment, replacing concrete sidewalks where required, water curb stops and services where required, driveway aprons and placing topsoil and hydro-seed to restore areas disturbed by construction activities.

Project Schedule

Construction is anticipated for the summer and fall of 2017. 
 

Questions?

If you have questions or need more information, contact City Project Engineer, Mr. Frank Bonn, at (585) 428-8257.