About the Project
This project provides for the preventative maintenance repairs to the Court Street Bridge over the Genesee River and the East Main Street Bridge over CSXT railroad line. The preventive maintenance will include repair or replacement of various elements of the bridges as well as cleaning and painting of the structure. This is a Federal-Aid local bridge project that the City of Rochester is administrating: Two Bridge Preventative Maintenance Project (NYSPIN 4755.60).
Project Schedule
The Project is currently in the design phase with construction anticipated to begin in the spring of 2013.
Project Documents
Questions?
Please contact Thomas C. Hack, P.E , Sr Structural Engineer at hackt@cityofrochester.gov or by phone at (585) 428-6852.