-
Water Main Extensions and Improvements Project
services (from the water main to the curb stop). The curb stop is usually located between the curb … in the same location as the existing water main. In these cases temporary bypass water main and services … of Public Health before the bypass pipe is placed into service. What to Expect Notification letter …
-
Water Main Cleaning and Lining Project
projects for the City. Construction Updates 2023 Water Main Lining and Lead Service Line Replacement … Project This years annual project will rehabilitate water main along with the replacement lead service … lines along these mains. Download the Project Area Map to review which streets and which services …
-
Orange Street & Saxton Street Rehabilitation Project
of Environmental Services Design Consultant: City of Rochester Department of Environmental Services …
-
Parking Emergency Streets
Garage and the Regional Transit Service will provide free service between the garage and designated …
-
Mount Read Boulevard Corridor Study
intersections with service roads and crossing arterials, bicycle/pedestrian conditions including poor sidewalk … circle, accessibility of businesses along the service roads and traffic congestion at Lyell Avenue …
-
Waring Road Improvements
, curb ramps, sidewalks, driveway aprons, new water main, water services, hydrants, catch basins, manhole …: City of Rochester Department of Environmental Services Project Design: CPL Project Administration: New …
-
Bicycle Boulevards Plan
facilities and bicycle-supportive services. A major product of the BMP is a prioritized list of arterial … will greatly enhance Bicycle Level of Service in these difficult corridors and in so doing, will greatly …
-
Inner Loop East Project
of Environmental Services Project Design: Stantec Consulting Services Inc Construction: Catco Construction
…
-
Sawdey Way - Building a Green Street
stretch of street, both police and fire service delivery are negatively impacted since it takes longer …
-
Union Street Railroad Bridge Improvement Project
Services Architectural Consultant: Barkstrom and LaCroix Construction Management: City of Rochester …
-
Thurston Village Revitalization Project
Project Management City of Rochester - Department of Environmental Services Project Design Erdman …
-
Genesee Gateway Park (Erie Harbor Enhancements - Phase II)
of Environmental Services - Development Division, at (585) 428-7124 or email him.
…
-
Durand Eastman Beach House and Master Plan
by the American Rescue Plan Act of 2021 (ARPA). Funding for the Master Plan design services are provided …