East Main Street Improvements

About the Project

The City of Rochester is reconstructing a section of East Main Street between N Goodman St and Culver Rd, including full depth pavement reconstruction, curb bump outs, a proposed two-way protected bike lanes (cycle track), widened sidewalks, enhanced street lighting, and landscaping. The three lane section is proposed to be reduced to two lanes, which will reduce travel speeds and enhance the bicycle/pedestrian environment (i.e., a "complete street”). Reconstruction of the roadway will improve the ride quality and reduce ongoing maintenance costs. Handicap accessibility will be upgraded as ADA and pedestrian access will be investigated and improvements made in this project where practically feasible and scheduled for the future where not feasible.

Documents

Stakeholder meeting one October 18, 2018

Project Team

Project Management: City of Rochester Dept of Environmental Services  
  • Project Design: Erdman Anthony 
  • This project is partially funded by federal Transportation Improvement Program funds distributed through the regional transportation improvement program and administered by New York State Department of Transportation.
  •  

     

    Schedule

    Preliminary Design 2018
    Final Design 2019
    Construction 2020-2021

     

    Questions

     questions should be emailed to the City's project manager, Mr. Timothy Hubbard.